Skip to content
HanRoy Mulga Downs

HanRoy Mulga Downs

HanRoy Mulga Downs Test Pitting and Access Track Construction

  • Small crew to clear access tracks into the location for the hydro drill rigs.
  • Construction of 7 hydro sumps (60m x 60m x 2m) sumps for the hydro rig operation.
  • 62 test pits along the proposed rail route for the geotechnical testing.