Gudai-Darri Mine – Finishing Works
Gudai-Darri Mine - Miscellaneous Finishing Works
- May 2022 - April 2023
- Lump Sum contract direct with the EPCM Worley.
- Road pavement construction of various mine site access roads.
- Management of major subcontractors for Asphalt and Two Coat sealing, line marking and road furniture.
- Construction of Land farm facilities including bulk earthworks and drainage including winning of import material for treatment pads, high-density polyethylene (HDPE) and geotextile lining, miscellaneous concrete, bunds, access tracks, laydown areas and fencing: and
- Rehabilitation for disturbed areas and borrow pit.
FMG Grout Wall
FMG Queens Hydraulic Barrier Wall - Bulk Earthworks
- May 2021 - December 2024
- In partnership with FMG and Golders, constructing an underground hydraulic barrier in Queen's Valley.
- Providing specialised operators for deep trench operations.
- Bulk earthworks and Grout Batch Plant operators (24hr Operation)
- Maintenance and operation of purpose-built grout injection vehicles and grout delivery vehicles.
RTIO Ops – Tom Price
Rio Tinto - Tom Price - Misc Earthworks
- July 2021 - Ongoing
- Clearing vegetation and remediation of onsite drains.
- Installing rock protection and facing to batters and headwalls.
- Onsite dust suppression.
- Day works as required.
RTIO – Nammuldi
Rio Tinto Sustaining Capital - Nammuldi - Lens EF Road Construction
- April 2021 - February 2022
- Construction of 10km of new internal mine road to RTIO/MRWA standard.
- Borrow to fill 150,000m3 (including sourcing, blending & conditioning of embankment and basecourse as required)
- Installation of 1km of 600mm Dia CSP Culverts withing roadwork formations.
- Supply & installation of roadside furniture including road signage, guideposts, and guardrails.
- Sealing / Line marking of extent of roadworks.
- Diversion Drain
- Maintenance of access roads and tracks, including dust suppression for the duration of the works.
FMG Solomon – TSF
FMG Solomon TSF - Bulk Earthworks
- February 2023 - December 2024
- In partnership with FMG, constructing the first lift of the Solomon TSF.
- Utilising mining fleet, providing 50 specalised operators for large bulk earthworks.
RTIO Rehabilitation – Tom Price
Rio Tinto Rehabilitation - Tom Price
- July 2022 - Ongoing
- Clearing vegetation in designated areas.
- Load & Haul and reprofiling landforms to design criteria.
- Ripping and seeding across dozens of hectares.
RTIO – B2B4
Rio Tinto Sustaining Capital - B2B4 Access Road Construction
- March 2023 - November 2023
- Construction of 5km of new internal mine road.
- Borrow to Fill 200,000m3 (including sourcing, blending & conditioning of embankment and basecourse as required)
- Supply & installation of roadside furniture including road signage, guideposts and guardrails.
- Sealing / Line marking of extent of roadworks.
BHP Stockyards Expansion
Lorrex Contracting was awarded an Earthworks contract at the Stockyards at South Flank. Work Packages include:
- June 2023 - February 2024
- Mining of Stockyard Rows E and F
- 3Mt Stockpile Footprint works
- Doze Crushed Material West
- Relocate material to 3Mt Stockpile Base
- Relocate material to Rehandle Stockpile
BHP Stemming Services
Lorrex Contracting are operation and maintaining a Kleeman Crushing and Screening Plant and all of its Plant and Equipment (CAT980 Loaders)
- Produce Stemming material in line with BHP’s monthly crushing.
- Approximately 1,150 tonnes of stemming produced per day and 2,404t of -15mm waste.
- Approximately 23,500t of stemming per month.
Gudai-Dari Rail Project
Lorrex Contracting undertook earthworks along the entire 200km of RTIO Gudai-Darri rail spur prior to new Rail handover to RTIO.
- Maintenance of Access Tracks.
- Supply and installation of road signage.
- Rehabilitation of Rail construction camps.
Gudai-darri (Koodaideri) Mine
Rio Tinto awarded Lorrex Contracting for contract work on this $3.6 billion investment in North West WA. Services included:
- Heritage and delineation works.
- Construction of 8km of village access roads.
- 300,000cm3 of embankment fill.
- 2km of CSP culverts.
- Road furniture (guide rails, delineators).
- 1.5km levee bank.
Solomon Mine
This fully operational open-cut iron mine near Tom Price in WA utilises the expertise of Muntulgura Guruma for a five year road maintenance contract. It employs up to 50 people. Services include:
- Maintaining approximately 150km to Main Roads WA specification.
- Provision of traffic management.
- Maintaining approximately 20km of Shire of Ashburton roads.
- Maintaining approximately 80km of Eliwana rail access.
Eliwana Mine and Rail Project
For this $1.72 billion project near Tom Price in WA, Muntulgura Guruma provided 90 skilled staff (at peak) over 18 months to carry out:
- Road construction and improvement works.
- Construction of the ballast pad, sleeper pad and camp pad.
- Road maintenance works.
- Miscellaneous civil works including culverts, tracelines and rail crossings.