Lump-sum civil infrastructure across the mining and construction sectors, including major road construction, tailings storage facilities, water infrastructure and bulk civil earthworks.
Completed
- Muntulgura Guruma delivered Stage 4 of the B2B4 Access Road Upgrade within the Greater Brockman area.
- The scope included clearing and topsoil removal, establishment of borrow pits, foundation and pavement earthworks, cement stabilisation, culvert installation, rock pitching, roadside furniture, sealing, line marking and maintenance of construction access roads.
Completed
- Muntulgura Guruma completed Stage 5 of the B2B4 Access Road Upgrade at Brockman 2 Mine.
- The works included construction of approximately seven kilometres of new internal mine road in accordance with applicable Rio Tinto and Main Roads Western Australia requirements.
Completed
- Muntulgura Guruma completed Stage 6 of the B2B4 Access Road Upgrade at Brockman 2 Mine.
- The works included construction of approximately three kilometres of new internal mine road in accordance with applicable Rio Tinto and Main Roads Western Australia requirements.
Completed
- Lorrex Contracting constructed new internal mine roads at Gudai-Darri, including the mine entrance road, village light-vehicle access road and plant light-vehicle access road.
- The scope included earthworks, embankment and basecourse preparation, culvert installation, roadside furniture, road maintenance and dust suppression, together with construction of the village diversion levee.
Completed
- Lorrex Contracting completed miscellaneous earthworks along the Gudai-Darri rail spur before handover to Rio Tinto.
- The works included batter trimming, access-track maintenance, dust suppression, installation of roadside furniture, clearing of culverts and vegetation, rehabilitation of borrow pits, laydown areas and construction camps, and construction of cattle-trough shade structures.
Completed
- Muntulgura Guruma constructed a new internal mine road at Nammuldi Mine in accordance with the applicable Rio Tinto and Main Roads Western Australia requirements.
- The works included borrow-to-fill earthworks, embankment and basecourse preparation, culvert installation, roadside furniture, sealing, line marking, construction of a diversion drain and maintenance of access roads.
Completed
- Muntulgura Guruma completed surveying support and clearing for a powerline corridor at Nammuldi Mine.
- The works included corridor pegging and clearing, localised cut-and-fill earthworks for construction access, and vegetation and topsoil stockpiling and removal.
Completed
- Construction of a new internal mine road to RTIO/MRWA standards.
Completed
- Muntulgura Guruma completed aquifer-related civil works at Silvergrass Mine.
Completed
- Lorrex Contracting delivered earthworks to support the expansion of stockyard facilities at BHP’s South Flank operations.
- The works included reshaping an existing waste dump, relocating material for capping and sheeting, excavation and haulage, expansion of the coarse ore stockpile pad, and construction and maintenance of laydown areas and haul roads.
Completed
- Muntulgura Guruma completed earthworks pads and access routes to support transmission line construction at Solomon Mine.
Safe, skilled and dependable mining support, specialising in high-volume mine pre-stripping, bulk load and haul solutions, and precision mobile crushing and screening.
Completed
- Muntulgura Guruma supplied operators, supervision and mobile plant to support construction of Stage 1 of the Brads Tailings Storage Facility.
- The works included loading, hauling, placement and compaction of conditioned mine waste to form compacted construction layers.
Completed
- Lorrex Contracting provided load-and-haul services to support ore movement at Gudai-Darri Mine.
- The works included continuous load and haul to the secondary crusher, movement of ore products within the stockyard and construction of a land bridge to support access to the next ore deposit.
Current
- Lorrex Contracting provides crushing and screening services to produce stemming material in accordance with BHP’s operational requirements.
- The project includes the operations and maintenance of crushing and screening plant and associated mobile equipment.
Current
- Lorrex Contracting provides mine stemming services at Roy Hill, producing stemming material in accordance with Hancock Iron Ore’s monthly crushing volume forecasts.
Reliable long-term civil earthworks teams, covering road maintenance, drainage infrastructure, general mine-site earthworks and exploration track and pad construction.
Completed
- Lorrex Contracting provided operators, supervisors and plant to support autonomous haulage enabling works at BHP’s Mining Area C operations.
- Key activities included bulk and detailed earthworks, construction of windrows, park-up and fuel bays, haul road widening and access-track construction.
Completed
- Muntulgura Guruma delivered civil and earthworks packages to support development of the Eliwana rail project.
- The works included construction of rail ballast, sleeper and camp earthworks pads, clearing of the rail corridor, road widening, drainage improvements, road maintenance and management of ballast and sleeper deliveries and stockpiles.
Current
- Muntulgura Guruma delivered road maintenance and improvement works across the Nanutarra-Munjina Road, Hamersley Road and Eliwana Rail Access Road.
- The scope included road maintenance, widening, drainage improvements and opening and closing roads during cyclone events on behalf of Main Roads Western Australia.
Completed
- Muntulgura Guruma supplied specialised operators, plant and operational support for the Queens Hydraulic Barrier works at Solomon Mine.
- The scope included deep-trench operations, bulk earthworks, continuous batch-plant support, and operations and maintenance of purpose-built grout injection and delivery vehicles.
Current
- Muntulgura Guruma provides rehabilitation of exploration access tracks and pads across various locations.
Current
- Muntulgura Guruma constructs exploration access tracks and pads at Solomon and subsequently rehabilitates the disturbed areas.
Current
- Muntulgura Guruma delivered civil works at Tom Price Mine, including vegetation clearing, drainage remediation and installation of rock protection to batters and headwalls.
- The project also included dust suppression and additional earthworks undertaken as required.
Expert land restoration supporting strict regulatory compliance, including waste-dump shaping, borrow pit remediation, topsoil placement and revegetation programs.
Completed
- Muntulgura Guruma delivered rehabilitation works across the Section Seven Back Fill Waste Dump, Marra Mamba West 4 Waste Dump Stage 3 and Section Seven West and Legacy Remnant areas at Greater Tom Price Mine.
- The works included reshaping landforms, rock-armour haulage and placement, construction of berms and bunds, topsoil haulage and application, surface preparation, drainage and stability works, ripping and seeding.
Completed
- Lorrex Contracting completed rehabilitation of exploration and development tracks and a former airstrip at Gudai-Darri Mine.
- The works included removing bunds, preparing and making good disturbed surfaces, ripping and seeding using native seed supplied by the client. Hand seeding was used on tracks, with mechanical seeding undertaken across larger areas.
Completed
- Lorrex Contracting completed rehabilitation of an approximately five-hectare footprint comprising legacy exploration tracks and pads at Gudai-Darri Mine.
- The works included ripping and seeding of disturbed areas.
Current
- Muntulgura Guruma is delivering rehabilitation of an approximately 11-hectare footprint comprising legacy exploration tracks and pads at Nammuldi Mine.
- The works include slope reshaping, topsoil spreading, ripping and seeding.
Completed
- Muntulgura Guruma completed rehabilitation of approximately 24 hectares of legacy exploration tracks and pads at Marandoo Mine.
- The works included slope reshaping, topsoil spreading, ripping and seeding.
Completed
- Muntulgura Guruma completed rehabilitation of approximately 27 hectares of legacy exploration tracks and pads at Tom Price Mine.
- The works included slope reshaping, topsoil spreading, ripping and seeding.
Completed
- Muntulgura Guruma completed rehabilitation of approximately 11 hectares of legacy exploration tracks and pads at Tom Price Mine.
- The works included slope reshaping, topsoil spreading, ripping and seeding.
Completed
- Muntulgura Guruma completed rehabilitation of approximately 28 hectares of legacy exploration tracks and pads and waste dump areas across Tom Price, Western Turner Syncline 1 and Western Turner Syncline 2.
- The works included slope reshaping, topsoil spreading, ripping and seeding.
Completed
- Waste dump reshaping, rehabilitation of the footprint area, slope reshaping, topsoil spreading, ripping and seeding.